Product · Hydrogen systems
HYPRPlant
Electric HydrogenAn integrated electrolyzer plant offering for hydrogen production.
Used for
Producing hydrogen for industrial projects using electricity and water.
Official source checked October 7, 2026
Explore by use
Storage, heat, hydrogen and battery materials solve different energy problems. Match the required output and duty cycle to the offering before comparing cost or efficiency claims.
Read each product’s published use, specifications and review date. Missing information is unknown, not a negative rating.
Product · Hydrogen systems
An integrated electrolyzer plant offering for hydrogen production.
Used for
Producing hydrogen for industrial projects using electricity and water.
Official source checked October 7, 2026
Product · Energy storage
A multi-day battery system based on reversible oxidation of iron.
Used for
Supporting utility-scale storage through multi-day grid stress events.
Official source checked October 7, 2026
Product · Building systems
A ductless heat pump system with indoor units, an outdoor unit, a dial and an app.
Used for
Room-by-room residential heating and cooling.
Official source checked October 7, 2026
Product · Industrial heat
A thermal storage system that converts electricity into stored high-temperature heat.
Used for
Supplying industrial process heat from stored electrical energy.
Official source checked October 7, 2026
Product · Industrial heat
A thermal battery system using solid carbon blocks to store energy as heat.
Used for
Providing industrial heat and power from stored renewable electricity.
Official source checked October 7, 2026
Product family · Battery materials
A silicon-carbon anode material for lithium-ion battery cells.
Used for
Replacing graphite anode material in battery cell designs.
Official source checked October 7, 2026
Define electricity, process heat, hydrogen or cell material requirements, including duration and temperature where relevant.
Confirm electrical connections, space, utilities, permitting, installation and commissioning responsibilities.
Ask about delivery dates, reference installations, warranted performance and the conditions used for published claims.
These are buying questions, not independently tested findings. Confirm current specifications, availability and suitability directly with the supplier.